RKEC Projects Limited
NSE: RKEC · Civil Construction
Share price ₹19.46
up 3.24% · close of 23 Nov 2026
Your ratios
Market cap
₹50.1 Cr
P/E ratio
—
P/B ratio
0.4
ROCE
-4.6%
ROE
-19.0%
Dividend yield
0.0%
as of 19 Nov 2026
1 · Overview
Overview
Price, valuation, sales and profit over the range you pick. Prices as of the last close; results as filed.
One candle a week · body: open to close, green when it closed higher · line: high to low
At a glance · 1Yr
Every small chart follows the range above. Point at it to read a value; click it to open it.2 · Results
Latest result · Q2 FY27
What the last results showed. Whether management kept its word is in Pro.
Net profit -₹40.0 Cr, down 2100.0% on Sep 2025
10 years, Mar 2017 to Mar 2026, and the last 12 months · key lines
| Line | Mar 2017FY17 | Mar 2018FY18 | Mar 2019FY19 | Mar 2020FY20 | Mar 2021FY21 | Mar 2022FY22 | Mar 2023FY23 | Mar 2024FY24 | Mar 2025FY25 | Mar 2026FY26 | TTMto Sep 2026 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Sales₹ crore | 197.00 | 240.00change on a year before +22% | 226.00change on a year before -6% | 304.00change on a year before +35% | 208.00change on a year before -32% | 211.00change on a year before +1% | 300.00change on a year before +42% | 352.77change on a year before +18% | 421.92 | 180.00 | 142.38change on a year before -61% |
| Expenses₹ crore | 169 | 201 | 184 | 238 | 176 | 186 | 246 | 302 | 369 | 196 | 242 |
| Employee cost₹ crore | 32.13 | ||||||||||
| Other expenses₹ crore | 338.33 | ||||||||||
| Operating profit₹ crore | 29 | 39change on a year before +34% | 41change on a year before +5% | 66change on a year before +61% | 32change on a year before -52% | 25change on a year before -22% | 54change on a year before +116% | 49change on a year before -9% | 53 | -16 | -100change on a year before -317% |
| Operating margin% of sales | 14.00% | 16.00% | 18.00% | 22.00% | 15.00% | 12.00% | 18.00% | 14.00% | 13.00% | -9.00% | -70.23% |
| Other income₹ crore | 3 | 1 | 1 | -10 | 3 | 3 | -2 | 4 | 7 | 6 | 10 |
| Interest₹ crore | 8 | 4 | 7 | 13 | 14 | 14 | 20 | 16 | 21 | 28 | 27 |
| Depreciation₹ crore | 3.00 | 3.00 | 4.00 | 4.00 | 4.00 | 4.00 | 5.00 | 8.12 | 8.87 | 9.00 | 9.00 |
| Profit before tax₹ crore | 20.00 | 33.00 | 32.00 | 39.00 | 17.00 | 10.00 | 27.00 | 28.24 | 29.98 | -47.00 | -128.00 |
| Tax rate% of profit before tax | 36.00% | 37.00% | 30.00% | 27.00% | 27.00% | 29.00% | 54.00% | 29.00% | 33.00% | -27.00% | |
| Net profit₹ crore | 13.00 | 20.00change on a year before +54% | 22.00change on a year before +10% | 29.00change on a year before +32% | 13.00change on a year before -55% | 7.00change on a year before -46% | 12.00change on a year before +71% | 19.96change on a year before +66% | 20.04 | -35.00 | -96.00change on a year before -700% |
| EPS₹ per share | 6.70 | 8.48change on a year before +27% | 9.35change on a year before +10% | 11.94change on a year before +28% | 5.32change on a year before -55% | 2.97change on a year before -44% | 5.18change on a year before +74% | 8.32change on a year before +61% | 8.35 | -13.44 | -37.45change on a year before -665% |
| Diluted EPS₹ per share | 8.35 | ||||||||||
| Dividend paid out% of net profit | 22.00% | 24.00% | 21.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
Small figure: change on the year before (TTM: on the 12 months to Sep 2025). TTM = the four quarters to Sep 2026. Lines that are 0 or blank in every column are not shown.
The last 13 quarters, Sep 2023 to Sep 2026 · key lines
| Line | Sep 2023Q2 FY24 | Dec 2023Q3 FY24 | Mar 2024Q4 FY24 | Jun 2024Q1 FY25 | Sep 2024Q2 FY25 | Dec 2024Q3 FY25 | Mar 2025Q4 FY25 | Jun 2025Q1 FY26 | Sep 2025Q2 FY26 | Dec 2025Q3 FY26 | Mar 2026Q4 FY26 | Jun 2026Q1 FY27 | Sep 2026Q2 FY27 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Sales₹ crore | 56.89change on a year before -21% | 106.03change on a year before -7% | 151.33change on a year before +125% | 84.67change on a year before +120% | 76.84change on a year before +35% | 118.98change on a year before +12% | 141.43change on a year before -7% | 76.07change on a year before -10% | 31.03change on a year before -60% | 32.65change on a year before -73% | 40.41change on a year before -71% | 17.32change on a year before -77% | 52.00change on a year before +68% |
| Expenses₹ crore | 51 | 86 | 138 | 71 | 66 | 99 | 133 | 65 | 24 | 26 | 84 | 36 | 96 |
| Material cost₹ crore | 0.00 | 45.15 | 0.00 | 0.00 | |||||||||
| Change in inventories₹ crore | 0.00 | -16.90 | 0.00 | 0.00 | |||||||||
| Employee cost₹ crore | 10.09 | 9.21 | -3.88 | 2.38 | |||||||||
| Other expenses₹ crore | 123.30 | 27.32 | 28.36 | 23.41 | |||||||||
| Operating profit₹ crore | 6 | 20 | 13 | 13change on a year before +63% | 10change on a year before +67% | 20change on a year before 0% | 8change on a year before -38% | 11change on a year before -15% | 7change on a year before -30% | 7change on a year before -65% | -44change on a year before -650% | -19change on a year before -273% | -44change on a year before -729% |
| Operating margin% of sales | 9.95% | 19.28% | 8.59% | 15.86% | 13.57% | 16.43% | 5.68% | 14.84% | 21.11% | 21.04% | -108.71% | -108.89% | -86.00% |
| Gross margin% of sales | 62.86% | ||||||||||||
| Other income₹ crore | 1 | 0 | 2 | 0 | 1 | 0 | 6 | 0 | 2 | 2 | 2 | 1 | 5 |
| Interest₹ crore | 3 | 4 | 5 | 4 | 4 | 6 | 5 | 5 | 3 | 5 | 11 | 4 | 7 |
| Depreciation₹ crore | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 1 | 3 | 2 | 3 |
| Profit before tax₹ crore | 1 | 14 | 9 | 7 | 5 | 11 | 7 | 5 | 2 | 2 | -57 | -24 | -49 |
| Tax rate% of profit before tax | 28.00% | 25.00% | 37.00% | 27.00% | 22.00% | 27.00% | 58.00% | 26.00% | 24.00% | 27.00% | -27.00% | -27.00% | -19.00% |
| Net profit₹ crore | 1change on a year before +47% | 11change on a year before +3% | 6change on a year before +2746% | 5change on a year before +67% | 4change on a year before +300% | 8change on a year before -27% | 3change on a year before -50% | 3change on a year before -40% | 2change on a year before -50% | 2change on a year before -75% | -41change on a year before -1467% | -17change on a year before -667% | -40change on a year before -2100% |
| EPS₹ per share | 0.41 | 4.45 | 2.29 | 2.21change on a year before +89% | 1.56change on a year before +280% | 3.44change on a year before -23% | 1.13change on a year before -51% | 1.40change on a year before -37% | 0.66change on a year before -58% | 0.66change on a year before -81% | -16.06change on a year before -1521% | -6.70change on a year before -579% | -15.35change on a year before -2426% |
| Diluted EPS₹ per share | 1.13 | 1.40 | 0.57 | 0.67 |
Small figure: change on the same quarter a year earlier. Lines that are 0 or blank in every column are not shown.
Sales and profit: growth a year, compounded, to Mar 2026; TTM is the last 12 months. Share price: to the latest close. A span can cross a demerger or an acquisition.
Sales
a year, compounded
- 5 years
- -3%
- 3 years
- -16%
- TTM
- -61%
Share price
a year, compounded
- 5 years
- -22%
- 3 years
- -35%
- 1 year
- -65%
Return on equity
average over the span
- 10 years
- 11%
- 5 years
- 4%
- 3 years
- 1%
- Last year
- -19%
3 · Quality & value
Answers
The questions investors ask most, each answered first in one line, then shown. From the company's own numbers.
How fast it has been growing
Our sales figures for this company step down at Dec 2019 and we hold nothing that says why, so we cannot honestly quote a growth rate across it.
Whether it grew faster than its sector
It grew -15.7% a year against a sector median of 7.5% — 23.2 percentage points slower.
Room to re-rate, or risk of de-rating
It has no earnings, so there is no price-to-earnings to compare.
Whether growth justifies the valuation
It has no earnings to weigh the price against.
How it compares with its peers
Against companies the exchange files under the same label (Civil Construction), it ranks 84 of 91 on returns, 85 of 93 on margin.
A longer bar is a better rank.
What makes it hard to beat — and is that still true?
It is losing money on the capital in the business, so there is no advantage to measure.
Whether its growth pays for itself
No — Over the last five years it made ₹26 crore of cash from the business but spent ₹123 crore on plant and equipment, ₹97 crore more than it made; the gap was mostly borrowed — borrowings rose from ₹149 crore to ₹257 crore.
But only about 27 of every 100 rupees of profit it reported over 10 years arrived as cash — the rest is tied up.
Peers here are the 91 companies the exchange files under the same label (Civil Construction). That grouping comes from the exchange's filing category, so some of them may not be real rivals.
Business score & profit checks
How strong the business is, and whether its profit is real cash. Facts only, not advice.
Business score
25 out of 100
How strong the business is, in one number. Last changed 23 Nov 2026.
Profit checks: is the profit real cash?
4 of 8 checks clear
Simple checks on the accounts. Which 4 are flagged is in Pro.
Key numbers & peers
Grouped by topic. Each number says what period it is for.
Price
- Market cap
- ₹50.1 Cr
- Prev close
- ₹19.46
- 52w High
- ₹62.6
- 52w Low
- ₹17.2
- Beta
- 1.2
- Price CAGR 1y
- -65.0%
- Price CAGR 3y
- -35.0%
- Price CAGR 5y
- -22.0%
- Price CAGR 10y
- —
Valuation
- P/E ratio
- —
- Industry P/E
- 15.0
- P/B ratio
- 0.4
- EV / EBITDA
- —
- Enterprise value
- ₹255 Cr
- PEG ratio
- —
- Dividend yield
- 0.0%
Returns
- ROCE
- -4.6%
- ROCE 5y average
- 10.4%
- ROE
- -19.0%
- ROE 3y average
- 1.0%
- ROE last year
- -19.0%
- Return on assets
- -6.3%
Sales, profit & margins
- Annual revenue
- ₹180 Cr
- Annual profit
- -₹35.0 Cr
- EPS
- ₹-13.4
- Operating margin
- -9.0%
- Net profit margin
- -19.4%
- EBITDA margin
- -8.9%
- Sales latest quarterSep 2026 quarter
- ₹52.0 Cr
- Profit latest quarterSep 2026 quarter
- -₹40.0 Cr
- OPM latest quarterSep 2026 quarter
- -86.0%
Growth a year
- Sales growth 3y
- -15.7%
- Sales growth 5y
- -2.9%
- Sales growth TTM
- -61.0%
- Profit growth 3y
- —
- Profit growth 5y
- —
- Profit growth TTM
- —
- YoY quarterly sales growthSep 2026 vs Sep 2025
- 67.6%
- YoY quarterly profit growthSep 2026 vs Sep 2025
- -2100.0%
Balance sheet
- Book Value
- ₹43.5
- Face Value
- ₹10.0
- Borrowings
- ₹257 Cr
- Total debt
- ₹263 Cr
- Total cash
- ₹33.0 Cr
- Net debtas of 31 Mar 2026
- ₹205 Cr
- Debt / Equity
- 2.3
- Interest coverage
- -0.7
- Reserves / Equity
- 5.5
Cash & payout
- Operating cash flow
- -₹30.0 Cr
- Free cash flow
- -₹30.0 Cr
- FCF yield
- -115.7%
- Net cash flow
- -₹4.00 Cr
- Dividend payout
- 0.0%
- Revenue per employeeyear to 31 Mar 2025
- ₹59.0 lakh
Holdings
- Promoter holding
- 57.7%
- FII holding
- 0.0%
- DII holding
- 3.5%
- Public holding
- 38.8%
Enterprise value, step by step
What buying the whole company would cost: its market value, less the cash it holds over its debt. Net debt from the balance sheet of 31 Mar 2026.
- Market cap₹50.1 Cr
- +Net debt₹205 Cr
- =Enterprise value₹255 Cr
Peers
| Company | Price ₹ | P/E | Mkt cap ₹ Cr | Div yield | Profit qtr ₹ Cr | Profit change | Sales qtr ₹ Cr | Sales change | ROCE |
|---|---|---|---|---|---|---|---|---|---|
| Larsen & Toubro | 4,099.90 | 29.6 | 5,64,105 | 0.93% | 5,949 | +27.17% | 78,750 | +15.84% | 16.24% |
| Rail Vikas Nigam Limited | 185.10 | 42.0 | 38,594 | 0.88% | 254 | +9.83% | 4,701 | -8.24% | 10.80% |
| Cemindia Projects Limited | 1,438.80 | 42.5 | 26,535 | 0.21% | 131 | +20.92% | 2,749 | +25.21% | 33.18% |
| Kalpataru Projects International Limited | 1,312.60 | 19.5 | 22,419 | 0.83% | 292 | +23.19% | 7,004 | +7.29% | 18.31% |
| IRB Infrastructure Developers Limited | 17.40 | 19.0 | 21,016 | 0.88% | 260 | +84.62% | 1,897 | +8.34% | 7.49% |
| NBCC (India) Limited | 77.65 | 28.5 | 20,966 | 1.28% | 210 | +33.66% | 3,396 | +16.54% | 33.25% |
| Engineers India Limited | 298.40 | 18.7 | 16,771 | 1.64% | 197 | +136.96% | 824 | -10.54% | 30.71% |
| RKEC Projects Limited | 19.46 | 50.1 | 0.00% | -40.0 | -2100.00% | 52.0 | +67.58% | -4.59% | |
| Medianof the whole group of 95, 24 Nov 2026 | 15.0 | 0.00% | +12.50% | +15.46% | 13.63% |
Median: the middle value of the whole peer group of 95 companies. Price and rupee sizes are left blank there, as a middle value of those says little.
Competes with 11 listed companies
Cemindia Projects Limited, Central Mine Planning & Design Institute Limited, Engineers India Limited, IRB Infrastructure Developers Limited, Ircon International Limited, KEC International Limited, Kalpataru Projects International Limited, Larsen & Toubro, NBCC (India) Limited, Rail Vikas Nigam Limited, Techno Electric & Engineering Company Limited
4 · Balance sheet & cash
Balance sheet
What the company owns and what it owes, at each year end and at the filed half-years. ₹ crore.
At Mar 2026: ₹552 cr of assets, and who funds them
Shareholders’ own money funds 31% of it; borrowings 47%.
What it owns
- Fixed assets ₹94.0 cr 17%
- Being built ₹6.00 cr 1%
- Everything else ₹452 cr 82%
Who funds it
- Shareholders’ money ₹169 cr 31%
- Borrowings ₹257 cr 47%
- Everything else ₹126 cr 23%
Each year end, then the filed half-years. Newest year end and newest half-year shaded.
| Line, ₹ crore | Mar 2017FY17 | Mar 2018FY18 | Mar 2019FY19 | Mar 2020FY20 | Mar 2021FY21 | Mar 2022FY22 | Mar 2023FY23 | Mar 2024FY24 | Mar 2025FY25 | Mar 2026FY26 | Sep 20256 months |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Equity capital | 19 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 26 | 25.82 |
| Reserves | 17 | 51 | 70 | 93 | 106 | 113 | 125 | 145 | 165 | 143 | 182.73 |
| Borrowings | 0 | 15 | 50 | 70 | 111 | 149 | 116 | 150 | 212 | 257 | 189.60 |
| Other liabilities | 77 | 60 | 116 | 145 | 138 | 81 | 175 | 147 | 180 | 126 | — |
| Total funding | 113 | 150 | 260 | 332 | 378 | 367 | 440 | 466 | 581 | 552 | 579.70 |
| Fixed assets | 11 | 14 | 20 | 33 | 55 | 52 | 54 | 53 | 103 | 94 | 98.47 |
| Being built (CWIP) | 0 | 0 | 10 | 23 | 0 | 0 | 9 | 28 | 7 | 6 | 6.89 |
| Other assetsreceivables, cash, rest | 102 | 136 | 230 | 276 | 323 | 315 | 377 | 385 | 471 | 452 | 474.34 |
| of which owed by customers | — | — | — | — | — | — | — | — | — | — | 155.86 |
| of which stock | — | — | — | — | — | — | — | — | — | — | 229.84 |
| of which cash | — | — | — | — | — | — | — | — | — | — | 43.79 |
| Total assets | 113 | 150 | 260 | 332 | 378 | 367 | 440 | 466 | 581 | 552 | 579.70 |
Half-year filings list fewer lines: there, Other assets is the total less the three lines above it, and Other liabilities is not filed as one line. Some half-year filings leave out leases, so Borrowings and Fixed assets can be lower than at the year end.
Cash flows
Real money coming in and going out — from the business, from investments and from loans. ₹ crore.
Pick a period to see where its cash went.
In words
- The business used ₹30.2 cr more than it brought in.
- It put ₹6.00 cr into assets and investments.
- It raised ₹32.0 cr from shareholders and lenders.
- Cash in hand fell by ₹4.00 cr. Free cash flow: −₹30.0 cr.
| Line, ₹ crore | Mar 2017FY17 | Mar 2018FY18 | Mar 2019FY19 | Mar 2020FY20 | Mar 2021FY21 | Mar 2022FY22 | Mar 2023FY23 | Mar 2024FY24 | Mar 2025FY25 | Mar 2026FY26 |
|---|---|---|---|---|---|---|---|---|---|---|
| From the business | 20.00 | -24.00 | 8.00 | 40.00 | -37.00 | 12.00 | 16.00 | 24.00 | 4.37 | -30.22 |
| From investing | 2 | -4 | -34 | -37 | 3 | -2 | 5 | -31 | -44 | -6 |
| From financingdividends, buybacks, loans | -23 | 25 | 24 | 0 | 30 | 15 | -41 | 13 | 37 | 32 |
| Net change in cash | -1 | -2 | -2 | 4 | -3 | 25 | -19 | 6 | -3 | -4 |
| Free cash flow | 20.00 | -30.00 | -1.00 | 10.00 | -40.00 | 10.00 | 0.00 | -2.00 | -74.98 | -30.00 |
| Cash ÷ operating profitbefore tax | 69.00% | -62.00% | 20.00% | 61.00% | -116.00% | 48.00% | 30.00% | 49.00% | 8.00% | 223.00% |
Free cash flow = cash from the business − spending on assets + what assets sold fetched; the same rule for years and half-years.
Efficiency ratios
How fast customers pay and how well capital earns. Each year, Mar 2017 to Mar 2026.
Debtor days
262 days
Days customers take to pay. Lower is faster.
262 days in FY26, against 146 days in FY25. Over these 10 years: 74 days (FY17) to 262 days (FY26).
Inventory days
1424 days
Days stock sits before it is sold.
1424 days in FY26, against 568 days in FY25. Over these 10 years: 54 days (FY18) to 1424 days (FY26).
Days payable
476 days
Days it takes to pay its suppliers.
476 days in FY26, against 331 days in FY25. Over these 10 years: 112 days (FY17) to 476 days (FY26).
Cash conversion cycle
1209 days
Debtor days plus inventory days, less days payable.
1209 days in FY26, against 382 days in FY25. Over these 10 years: 34 days (FY18) to 1209 days (FY26).
Working capital days
75 days
Days of sales tied up in running the business.
75 days in FY26, against 95 days in FY25. Over these 10 years: 5 days (FY17) to 123 days (FY23).
Return on capital (ROCE)
−5%
Operating profit on the capital used.
−5% in FY26, against 14% in FY25. Over these 9 years: −5% (FY26) to 58% (FY18).
At the half-year to Sep 2025: debtor days 265.60, inventory days 1,484.80.
5 · Owners & payouts
Dividends, splits & big trades
Money paid out, share splits and buybacks, and big buys or sells by funds and insiders.
Dividend a share, by the year of its ex-date
No dividend in the last three years; the last went ex on 16 Sep 2021, ₹1.20 a share.
Share of profit paid as dividend
Each year, Mar 2017 to Mar 2026.
Splits, bonuses & buybacks
None on record.
Big trades by funds and insiders
None listed for this company.
6 · Price & trading
Open interestPRO
Where option traders are positioned on this stock.
7 · Business
About
What the company is, from our own records: where it sits, where its revenue comes from, and where it works.
RKEC Projects designs and executes construction projects such as bridges, ports, dams and marine structures. Its buyers include Hindustan Petroleum Corporation, port authorities, defence organisations and municipal bodies, and its civil and defence work spans India. It reported revenue of ₹180 crore in FY 2025-26.
- Sector
- Construction
- Industry
- Civil Construction
- Symbol
- RKEC
- ISIN
- INE786W01010
Industry numbers
The numbers that matter most in this industry, from the company's own filings and earnings calls. Each one says its period.
Revenue and margin
- EBIT marginDec 2025 quarter · not the latest results18.38%
Working capital
- Days sales outstanding12 months to Sep 2026210 days
- Working capital to sales12 months to Sep 2025 · not the latest results104.95%
- Gross current asset daysFY to Mar 2025 · not the latest results367 days
Costs
- Employee costDec 2025 quarter · not the latest results7.27%
Profit quality
- Other income shareDec 2025 quarter · not the latest results84.74%
- Interest coverSep 2026 quarter-6.00x
Returns
- RoE12 months to Sep 2026-59.90%
- RoA12 months to Sep 2026-17.85%
- Sales to net block12 months to Sep 20261.60x
Growth
- Revenue growth (YoY)Sep 2026 quarter67.58%
Capex
- CapexFY to Mar 2026₹0.00 Cr
- Capex to revenueFY to Mar 20260.00%
How they have moved
EBIT margin · quarterly
Source: Computed from the filings
| Dec 25 | 18.38% | Computed from the filings |
| Sep 25 | 16.11% | Computed from the filings |
| Jun 25 | 11.83% | Computed from the filings |
| Mar 25 | 4.24% | Computed from the filings |
Employee cost · quarterly
Source: Computed from the filings
| Dec 25 | 7.27% | Computed from the filings |
| Sep 25 | — | not filed |
| Jun 25 | 12.11% | Computed from the filings |
| Mar 25 | 7.14% | Computed from the filings |
Other income share · quarterly
Source: Computed from the filings
| Dec 25 | 84.74% | Computed from the filings |
| Sep 25 | 100.00% | Computed from the filings |
| Jun 25 | 0.00% | Computed from the filings |
| Mar 25 | 85.71% | Computed from the filings |
Interest cover · quarterly
Source: Computed from the filings
| Sep 26 | -6.00x | Computed from the filings |
| Jun 26 | -5.00x | Computed from the filings |
| Mar 26 | -4.18x | Computed from the filings |
| Dec 25 | 1.45x | Computed from the filings |
Revenue growth (YoY) · quarterly
Source: Computed from the filings
| Sep 26 | 67.58% | Computed from the filings |
| Jun 26 | -77.23% | Computed from the filings |
| Mar 26 | -71.43% | Computed from the filings |
| Dec 25 | -72.56% | Computed from the filings |
Capex (fiscal year) · yearly
Source: Computed from the filings
| FY26 | ₹0.00 Cr | Computed from the filings |
| FY25 | ₹79.0 Cr | Computed from the filings |
| FY24 | ₹26.0 Cr | Computed from the filings |
Capex to revenue (fiscal year) · yearly
Source: Computed from the filings
| FY26 | 0.00% | Computed from the filings |
| FY25 | 18.72% | Computed from the filings |
| FY24 | 7.43% | Computed from the filings |
Supply chain
Links to other companies, as recorded in our map from filings and announcements. A news event that hits one of them can reach RKEC Projects Limited through this map.
Sells to · 22
- Adani Infra (India)Infrastructure civil construction services
- Cochin Port TrustPort / marine infrastructure construction
- Defence Research and Development OrganisationDefence civil construction
- Director General Naval Projects / Indian NavyDefence marine civil construction
- Essar Projects (India)Civil / infrastructure construction services
- Greater Visakhapatnam Municipal CorporationUrban civil infrastructure construction
- Gujarat Maritime BoardPort / marine infrastructure construction
- Haldia Dock ComplexPort / marine infrastructure construction
- Hindustan Petroleum CorporationCivil / marine EPC construction work
- Hindustan ShipyardMarine / shipyard civil infrastructure construction
+ 12 more
- Jawaharlal Nehru Port Authority (JNPT)Port / marine infrastructure construction
- Maharashtra Maritime BoardEPC passenger jetty and terminal at Radio Jetty near the Gateway of India, Mumbai
- Military Engineer Services / Indian Army Corps of EngineersDefence civil construction, incl. a 3-lane 500-ton slipway at Port Blair
- Mumbai Port AuthorityPort / marine infrastructure construction
- National Highways & Infrastructure Development Corporation (NHIDCL)EPC road and bridge work on NH-4 in the Andaman & Nicobar Islands
- National Highways Authority of India (NHAI)EPC construction - road and bridge works, incl. the Ganga bridge downstream of Farakka Barrage
- Petronet LNGMarine / civil EPC construction work
- Rashtriya Ispat NigamCivil / infrastructure construction services
- South Central RailwayStation upgradation under the Amrit Bharat Station scheme at Eluru, Chirala, Bapatla and Tenali (JV, 51% share)
- State Public Works DepartmentsCivil construction services
- Syama Prasad Mookerjee Port, KolkataPort / marine infrastructure construction and O&M
- Visakhapatnam Port AuthorityPort / marine infrastructure construction
Uses as raw material · 2
- Construction materials, stores and spares (structural steel, cement/concrete, aggregates)From India
- ElectricityFrom India
Depends on the price of · 3
- cementA higher price hurts it
- dieselA higher price hurts it
- steelA higher price hurts it
Competes with · 11 companies
- Larsen & Toubro
- Rail Vikas Nigam
- Cemindia Projects
- Kalpataru Projects International
- IRB Infrastructure Developers
- NBCC (India)
- Engineers India
- Central Mine Planning & Design Institute
- Ircon International
- KEC International
- Techno Electric & Engineering Company
Shaded: the companies compared in Key numbers & peers. Each name opens that company’s page.
8 · News & documents
News and what it reaches
Filings and news about RKEC Projects Limited, and bigger events that reach it through its owners, rivals, customers or suppliers. Newest first. Open one to see how the effect spreads.
28 Sep 202618:54 IST
AI-written from public sources · Information, not advice · Not SEBI-registered
Documents
Earnings calls, results presentations and annual reports, straight from the company and the exchanges.
Facts from company filings and exchange data. Not investment advice: nothing here tells you to buy or sell.